429 Too Many Requests
Assembly Gumax® Shading Panels
Assemble the Gumax® Shading Panels very easily yourself using the DIY click system. Discover how it works.
Assembly instructions
You can install Gumax® Shading Panels yourself very easily and quickly thanks to the handy DIY sliding system and rail system. Assemble it according to the steps in the assembly instructions and you will retain the 5-year manufacturer's warranty.
Please read the included assembly instructions in which we explain step by step how to install Gumax® Shading Panels and the rail system. It is also available as a download. And watch the assembly video.
Measuring Gumax® Shading Panels
You determine the height of Gumax® Shading Panels based on the distance from the top of the bottom rail to the flat underside of the gutter (Gumax® veranda) or the flat underside of the veranda (universal). Measure at three points and use the smallest size. Subtract 136 mm from this.
Are you also ordering a Gumax® veranda? Always mount the roof of your veranda at an 8-degree angle. To mount the panels on the sides, you need 8° glass wedges.
The distance between the slats
Determine how much light falls comes the Gumax® Shading Panels based on the distance between the slats. You can choose from the following distances:
- 10 mm (optional)
- 13 mm (standard)
- 16 mm (optional)
Assemble your Gumax® Shading Panels
To assemble Gumax® Shading Panels, you will need the following:
Rail system
- Gumax® rail system (Existing rail system of your Gumax® glass sliding doors or order separately as a package)
Supplied with Gumax® Shading Panel
- Cassette
- Frame set + manual
- Slat set
Optional:
- Spacers in 2 sizes
It is important to install Gumax® Shading Panels on a solid foundation. If your terrace is sturdy enough, you can mount them on it. In other cases, this can be solved by installing a foundation beam.